Ask a spreadsheet factory what one cabinet costs and you usually get the material price list summed up, plus a percentage "for overhead" that someone chose years ago. Prices get set on that number, and nobody finds out until the annual accounts that half the products lose money.
Product costing answers the question properly, twice: before production, as a standard cost built from the BOM and the routing, and after production, as the actual cost collected on each work order. The difference between the two, the variance, is where the management information is.
What goes into product cost
Under PSAK 202 (formerly PSAK 14, and IAS 2, which it follows), the cost of manufactured inventory includes:
- Direct material: components consumed, including normal scrap.
- Direct labour: the wages of people working on the product.
- Production overhead: indirect factory cost (machine depreciation, factory electricity, supervision, maintenance), allocated on a normal level of activity.
Selling costs, administration and abnormal waste are not product cost; they are expenses of the period. That boundary matters, because whatever sits in product cost stays on the balance sheet as inventory until the goods are sold.
Standard cost: the roll-up
A standard cost is calculated bottom-up from the master data described in Bills of materials and routings. Take Cabinet C-200, costed for a batch (the costing lot size) of 50.
Material
| Component | Qty per | Scrap | Planned qty | Cost | Amount |
|---|---|---|---|---|---|
| Steel sheet (kg) | 3 | 5% | 3.15 | 18,000 | 56,700 |
| Shelf SH-05 | 3 | 0% | 3 | 25,000 | 75,000 |
| Screw M4 | 24 | 2% | 24.48 | 300 | 7,344 |
| Powder coat (kg) | 0.2 | 10% | 0.22 | 80,000 | 17,600 |
| Material | 156,644 |
A sub-assembly made in-house contributes its own rolled-up cost, which is why the roll-up starts at the lowest level.
Labour and overhead
Minutes per unit = run minutes + setup minutes ÷ lot size. Each work centre has an hourly labour rate and an hourly overhead rate.
| Operation | Minutes per unit | Labour rate / h | Overhead rate / h | Labour | Overhead |
|---|---|---|---|---|---|
| Press (2 + 30/50) | 2.6 | 60,000 | 90,000 | 2,600 | 3,900 |
| Brake (3 + 20/50) | 3.4 | 60,000 | 60,000 | 3,400 | 3,400 |
| Paint (1.5 + 45/50) | 2.4 | 50,000 | 120,000 | 2,000 | 4,800 |
| Assembly (12 + 0) | 12.0 | 45,000 | 15,000 | 9,000 | 3,000 |
| Total | 17,000 | 15,100 |
Standard cost = 156,644 + 17,000 + 15,100 = Rp 188,744 per cabinet.
Process loss, co-products and by-products
A BOM's process loss is material too: with 20% loss, the material line above is planned at quantity ÷ 0.8, so the standard already carries the normal loss and a batch that loses exactly that closes without a variance. Abnormal loss beyond it shows as usage variance.
When a BOM makes more than one output, the roll-up gives the BOM's item only its part of the joint cost. By-products are taken off at their value first; co-products then take their cost share of what is left. For the rice mill in Bills of materials and routings:
| Per kg of rice | |
|---|---|
| Paddy 2 kg × Rp 5,000 | 10,000 |
| less bran 0.5 kg × Rp 1,000 | −500 |
| Joint cost | 9,500 |
| less broken rice, 20% | −1,900 |
| Standard of head rice | 7,600 |
The co-products keep their own standards; set them so that the shares and the standards agree, or the difference appears as production variance.
Setting overhead rates
The overhead rate is a budget: expected factory overhead for the year ÷ expected hours at the work centre. If PAINT is expected to carry Rp 288 million of overhead over 2,400 hours, its rate is Rp 120,000 per hour. Use normal capacity, not the hours you hope for, so a quiet month does not load each product with idle cost; under PSAK 202, unabsorbed overhead from low production is an expense of the period.
Actual cost: the work order
Now the work order for 50 cabinets runs. The press operator wastes some sheet and assembly takes an hour longer than planned:
| Standard (50 units) | Actual | Difference | |
|---|---|---|---|
| Steel | 157.5 kg = 2,835,000 | 165 kg = 2,970,000 | 135,000 |
| Shelves, screws, powder | 4,997,200 | 4,997,200 | 0 |
| Labour | 850,000 | 895,000 | 45,000 |
| Overhead | 755,000 | 770,000 | 15,000 |
| Total | 9,437,200 | 9,632,200 | 195,000 |
The journals through WIP
Production cost accumulates in work in progress (WIP), an inventory account, and leaves it when output is received:
| Step | Debit | Credit | Amount |
|---|---|---|---|
| Issue material | WIP | Inventory | 7,967,200 |
| Absorb labour on operations | WIP | Applied labour | 895,000 |
| Absorb overhead on operations | WIP | Applied overhead | 770,000 |
| Receive 50 cabinets at standard | Inventory | WIP | 9,437,200 |
| Close the work order | Production variance | WIP | 195,000 |
After the close, WIP for this order is zero: 9,632,200 in, 9,437,200 + 195,000 out.
Applied labour and Applied overhead are credit balances that offset the real wage and factory expense accounts. If the factory actually spent more on overhead in the month than all work orders absorbed, the net of the two shows under-absorbed overhead, a period cost to investigate (low volume, or rates set too low).
Reading variances
A variance is a question, not a verdict. The usual breakdown:
| Variance | Formula | Typical cause |
|---|---|---|
| Material price | (actual price − standard price) × actual qty | Supplier price change, rush buying, freight |
| Material usage | (actual qty − standard qty) × standard price | Scrap, wrong BOM, theft, backflush errors |
| Labour efficiency | (actual hours − standard hours) × standard rate | Slow run, rework, wrong routing time |
| Labour rate | (actual rate − standard rate) × actual hours | Overtime, wage increases |
| Overhead | Absorbed vs actual overhead | Volume differs from plan, cost overruns |
In the example, the 135,000 is a material usage variance (7.5 kg extra steel) and the 60,000 is labour and overhead efficiency (one extra hour of assembly). Under standard costing, the material price variance is caught earlier, at goods receipt: stock goes in at standard and the price difference goes straight to variance. If the supplier's bill then differs from the PO price, that difference also goes to variance when the bill clears GRNI, under every costing method. See Inventory valuation.
Changing the standard
Standards are usually updated once a year, or when a large price change makes them meaningless. The update has an accounting effect: stock already on hand must be revalued from the old standard to the new one. SAP calls this mark and release; the same idea applies everywhere:
- Run the roll-up and review the new estimates (draft).
- Mark the estimates you accept.
- Release them: the item's cost changes and stock on hand is revalued, the difference going to a revaluation account.
Work orders already open keep the cost their material was issued at; the difference shows in their variance when they close.
In Voltrus
Things to know: Voltrus posts the whole difference to one production variance account; the price, usage and efficiency split above is analysis you do from the work order's cost panel. Under moving average or FIFO there is no production variance to read: the order's real cost, waste included, goes into the finished goods and reaches cost of goods sold when they ship. That is correct inventory accounting (PSAK 202 counts conversion costs in inventory), but it hides inefficiency inside the product cost, which is another reason to use standard costing in a factory. Actual wages reach the ledger when a Voltrus payroll run is posted (direct labour employees to the direct labour account), or by importing the totals from your payroll system.
Checklist
- Every purchased component has a cost; every work centre has labour and overhead rates.
- Overhead rates are budget ÷ normal hours, reviewed yearly.
- Costing lot sizes match the batches you run.
- Work order variances above a threshold are explained within a week.
- Standards are rolled up, reviewed and released at a fixed time each year.